The signatures for drilling enter tomorrow at Block 2 of the Ionian Sea
New

The signatures for drilling enter tomorrow at Block 2 of the Ionian Sea

Another decisive step to carry out the first research drilling in the country after nearly half a century, will take place tomorrow with the signing of the drilling contract for Block 2 in the Northwest Ionian Sea. The drilling contract will be signed by ExxonMobil – Energean – HELLENiQ Energy and Stena Drilling in the presence of the Minister [...]

See more
The attack of «Zombies»: Models that refuse to die
New

The attack of «Zombies»: Models that refuse to die

In the US, the abolished Fiat 500X achieved something unlikely: it oversold the brand new electric 500e in the first quarter of 2026. According to Stellantis data, 71 500X units that had stopped production for three years found buyers, against only 68 of the new 500e. The practicality and conventional engine seem to defeat the electric future with a price of $30,000+ and an autonomy of 240 km. Other "zobby" models such as Jeep Renegade and Dodge Challenger also continue to be sold, revealing American consumers' preferences.

See more
Lauren Sanchez says she's ready to have a child at 56 with 62-year-old Jeff Bezos.
New

Lauren Sanchez says she's ready to have a child at 56 with 62-year-old Jeff Bezos.

56-year-old Lauren Sanchez told the New York Times on Saturday that she is ready to have a child with her husband, Jeff Bezos. «I'd get another tomorrow.», stressed features, with her representative later clarifying that she is not pregnant. Sanchez already has three children from previous relationships, while Amazon's 62-year-old owner is the father of four children with his ex-wife, Mackenzie Scott. The couple married in June 2025 in a glowing ceremony in Venice.

See more
How the system stood the perfect storm. ..
New

How did the system last the perfect storm?

The Greek electric system successfully passed the Easter 2026 test, despite a low demand and high output coincidence from RES that created a surplus of up to 3-4 GW. There was the preparation with a meeting on Great Wednesday under the ministers of S. Papastavrou and N. Tsafos, as well as daily monitoring through teleconferences. IPTO used exports, RES teleregulation and pumping units, while storage systems were first used. The HEDNO achieved impressive progress, increasing remote-controlled stations from 1,638 (2.286 MW) in 2025 to 6,200 (5.4 GW) in 2026, reducing network interventions from 14 to 7 days.

See more
EnglishenEnglishEnglish

Connection

Registration

Restore Password

Enter your alias or email address and you will be sent a link to create a new password.